Knowledge for steel fabricators

Short, concrete papers on standards, documentation, testing and material. No generalities — tables, standard numbers and examples.

2026-11-27

NDT extent per EN 1090-2 (Table 24): why one number per project is not enough

“EXC2 — 10% MT” is a shortcut that does not pass acceptance. Table 24 of EN 1090-2:2018+A1:2022 does not give one number per project: the extent follows from the features of each joint, and one design change recalculates it.

Read →
2026-11-27

As-built documentation in EXC2: 13 document types and hundreds of links between them

The list of documents for EXC2 fits on one page. The difficulty lies elsewhere: a 22 t structure means about 125 pages in which every part, heat, welder and WPS must match — also after a design revision.

Read →
2026-11-27

Cutting waste for steel sections: why 12% in a quote is a guess

Quotes usually assume 12% waste. In the orders from our database the purchase surplus of sections over the structure weight ranged from 5% to over 50%. A fixed number sometimes inflates the price and sometimes eats the margin.

Read →
2026-11-27

Price per kg of a steel structure: what it consists of and what most often slips out of the estimate

The price per kg is more than a dozen components, each depending on something else: the cutting plan, the section weight, the coating system, the contract terms. Missing one is enough for a project to stop making money.

Read →
2026-11-27

Splicing steel sections: when it pays off and what it entails

A butt splice lets you cut a part from two pieces instead of a new bar. The steel saving is visible immediately; costs and obligations show up only in production and documentation.

Read →
2026-11-27

Who welded this element? Traceability of a steel structure years later

The claim arrives two years later: a cracked weld, flaking coating. The questions are always the same — who, when, from what material, with which procedure, in what conditions. From binders the answer takes days, and sometimes there is none.

Read →
2026-11-27

Painting a steel structure: film thickness, litres of paint and the conditions that decide on claims

Corrosion protection is the only part of a structure the client judges with the naked eye for years. Whether it lasts is decided by numbers: thickness, volume solids, surface preparation and the conditions at the time of application.

Read →
2026-11-27

Web-based or installed software? Data security for steel fabricators

A fabricator’s data means quotes, prices, client lists, certificates and documentation for years. The question is not “cloud or not”, but: who takes care of backups, updates and access — and can they prove it.

Read →
2026-11-27

Mill certificates: why “we have the certificates” is not enough at handover

A binder full of certificates does not mean the documentation will stand up. The client asks about a specific member: which heat, does the certificate match the section and grade, does it cover the delivered mass. That is where the problems start.

Read →
2026-11-27

Lead time of a steel structure: why the promised date slips

The date in a quote is a promise based on what the shop will do in a few weeks — together with other projects, holidays and the paint shop. Most often it is given from experience. Most often it also slips.

Read →
2026-11-27

Retyping material lists from the design: what it costs and where errors come from

Everything downstream depends on the design list: cutting plan, order, labels, certificates, documentation and the quote. An error in one hand-typed row shows up weeks later — at the saw, at handover or in the final account.

Read →
2026-11-27

Scope changes and design revisions: how not to give money away in a variation

A design rarely stays as it was in the quote. One 88 t project from our database had four list revisions during execution. Each changes mass, material, cutting and documentation — and for the variation it has to be calculated before the client forgets what was ordered.

Read →
2026-11-27

EN 1090 documentation without an extra hire: what the software takes over and what stays with the coordinator

Fabricators look for help with EN 1090 documentation: a new hire, an outside firm, someone to “handle the paperwork”. Most of this work is not decisions but collecting, retyping and keeping links consistent — and that part software can take over.

Read →
2026-11-27

WPS, WPQR and welder qualifications: where welding documentation stops adding up

A WPS register in a binder and valid welder certificates on the wall are only the start. Auditors and clients ask about a specific weld: which procedure, which wire, who welded it and was their qualification valid at the time.

Read →
2026-11-27

Steel stock and offcuts: why material sits in the yard while the shop buys new

Sections worth tens of thousands lie in the yard, and the same profile is ordered for a new project. Not out of laziness — because nobody knows for sure what is there, how long it is, whether it is promised to another project and whether it has a certificate.

Read →
2026-11-27

Declaration of performance and CE marking of a steel structure: what has to match

A declaration of performance is one or two pages, but by signing it the manufacturer takes responsibility for the whole structure. Every value in it must follow from the rest of the documentation — which keeps changing until the last day of the project.

Read →

See the software on your own job

Send a list from one project — in 20 minutes we’ll show cutting plans, orders, documentation and the estimate.

Prefer to talk? Call us — in 15 minutes we’ll tell you whether the software fits your shop and where to start.
✉ ContactDemo