Retyping material lists from the design: what it costs and where errors come from
Published: 2026-11-27
Everything downstream depends on the design list: cutting plan, order, labels, certificates, documentation and the quote. An error in one hand-typed row shows up weeks later — at the saw, at handover or in the final account.
1. Scale
| Project | Shipping assemblies | Parts (items) | Parts (pieces) |
|---|---|---|---|
| hall 22 t | 88 | 359 | 600 |
| building 112 t | 195 | 2,141 | 6,567 |
At one minute per part (typing and checking), the 112 t list is about 36 hours of work — before anyone calculates a cutting plan.
2. Where errors come from
| Source of error | Real example (no names) |
|---|---|
| Rounded masses in the document | rounded piece masses gave a 38 kg difference between lists in an 88 t project |
| Assembly split across PDF pages | parts from the second page assigned to the wrong assembly |
| List replaced after a revision | parts doubled: 32 t of material for a 17.8 t structure |
| Column in the wrong place | a dimension read as a grade: “5438 X 150 X 48” in the grade column |
| Painting area × number of pieces | m² inflated several times — paint shop forecast shifted by months |
| Section names | different names for the same section (e.g. C / UPN, RHS / SHS) — renaming in the list breaks consistency with quality documentation |
| Scan instead of a PDF with a text layer | digits 6 / 8, 1 / 7 in lengths |
3. Three lists that must agree
The shipping list (assemblies), the structural list (assemblies with parts) and the material list (parts by section and grade) are the same data in three layouts. The mass of an assembly must equal the sum of its parts, and the material total — the mass of the structure. Every manual correction in one list requires the same correction in the other two — and in the cutting plan, order and labels created from them.
4. Design revision
A new version of the lists during production: some members are cut, some welded, QR labels printed and attached. You have to find out what changed, what to add, what not to make any more — and keep the same labels for members that did not change.
How it works in the software
The software reads lists from PDF (including scans) and Excel with AI, checks mass totals and row completeness, and will not save a list that does not add up. A revision is loaded as an addition or a replacement — labels of unchanged assemblies stay the same.
This paper does not replace the standard. The text of the standard and the project specification are binding.