WPS, WPQR and welder qualifications: where welding documentation stops adding up

Published: 2026-11-27

A WPS register in a binder and valid welder certificates on the wall are only the start. Auditors and clients ask about a specific weld: which procedure, which wire, who welded it and was their qualification valid at the time.

1. Scale

One fabricator in our database has 44 active WPS covering thicknesses from 2 to 40 mm: butt welds in more than a dozen edge preparations and fillet welds from a3 to a16. Every project has to be matched to them — by thickness, joint type, material, process and consumable.

2. Where it drifts apart

SituationReal example (no names)Consequence
Gap in the thickness range25 mm plate in the project, WPS end at 24 mm and start at 26 mma weld without a procedure — new qualification or design change
Consumable on the certificate ≠ consumable in the WPScertificate for solid wire, all 44 WPS for flux-cored wirethe documentation contradicts itself — found at the audit
Consumable certificate issued to a tradercustomer on the certificate ≠ fabricatora document linking the batch to the delivery is needed
Welder without qualification on recordfour welders with hours booked on projects, no certificate in the registerqualification cannot be shown for the welds they made
Qualification valid today, not on the welding dayrenewed after expirythe welding date counts, not the handover date
New thickness after a design revisionrevision adds a plate outside the rangesmissing WPS discovered only on the shop floor

3. The chain that has to hold

Weld → assembly → parts and their thicknesses → WPS and WPQR → consumable with certificate → welder with a qualification valid that day → VT inspector → NDT extent. Every link lives somewhere else: the WPS register with the coordinator, consumable certificates in purchasing, qualifications in HR, hours in time tracking, lists in the design. One change — new wire, new welder, design revision — means checking the whole chain for every project in progress.

4. When it shows up

  • at the factory production control audit — on a sample of one project’s documentation,
  • at handover — when the client wants a list of welders with qualification numbers,
  • at a claim — years later, when you need to establish who welded and to which procedure.

How it works in the software

The WPS and WPQR register, consumable certificates and personal qualifications sit in one place, linked to the project. The software shows thicknesses without a WPS, warns about a consumable certificate that does not match the WPS and about a welder without a valid qualification, and a QR scan records who welded the assembly and when.

This paper does not replace the standard. The text of the standard and the project specification are binding.

See the software on your own job

Send a list from one project — in 20 minutes we’ll show cutting plans, orders, documentation and the estimate.

Prefer to talk? Call us — in 15 minutes we’ll tell you whether the software fits your shop and where to start.
✉ ContactDemo