EN 1090 documentation without an extra hire: what the software takes over and what stays with the coordinator
Published: 2026-11-27
Fabricators look for help with EN 1090 documentation: a new hire, an outside firm, someone to “handle the paperwork”. Most of this work is not decisions but collecting, retyping and keeping links consistent — and that part software can take over.
1. What documentation work consists of
| Task | Who must | Who can take it over |
|---|---|---|
| Collecting certificates from suppliers and assigning them to material | — | software (supplier link, assignment to groups) |
| Checking a certificate: section, grade, type 3.1, mass | — | software (warnings), a person accepts |
| Selecting WPS for the project’s thicknesses and joints | coordinator approves | software suggests and shows gaps |
| NDT extent | coordinator approves | software calculates from Table 24 and points to members |
| VT / NDT inspection | qualified inspector / laboratory | — |
| Reports with a list of members | inspector signs | software fills them from project data |
| Declarations of performance, CE marking | authorised person signs | software issues them from project data |
| Welder qualifications — valid on the day of welding | coordinator is responsible | software warns |
| As-built dossier with table of contents | — | software assembles one PDF |
| Signatures | qualified persons | software sends signing links or prints for signature |
2. Why an extra hire does not solve the problem
- The documentation person collects data from everyone: purchasing, the shop, quality control, suppliers — and is always last in the chain.
- Every list revision, substitute from stock or new supplier means manual corrections in several places.
- Knowledge of “which certificate belongs where” sits in one person’s head — a holiday or a resignation stops handovers.
- A 22 t project is about 125 pages, 88 t — about 195. With several projects at once that is hundreds of pages a month.
3. What stays with people
Decisions and responsibility: approval of WPS and test extent by the welding coordinator, inspections by qualified persons, signatures of authorised persons. The standard requires qualified people — it does not require them to retype data.
How it works in the software
Documentation is created during the project from the same data used for the cutting plan, the order and production. The as-built dossier is one button, and the software warns about gaps before the client sees them.
This paper does not replace the standard. The text of the standard and the project specification are binding.